Constraint-based master scheduling problem.
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
University of Ottawa (Canada)
Abstract
In the manufacturing industry, many problems pertain to part management, assembly and scheduling. Products today largely consist of a series of components which themselves can, in turn, consist of more components. The assembly of a product becomes an exercise in assembling all of the sub-components in a timely fashion. Sometimes these sub-components are available in stock, while other times, they must be manufactured using other sub-components. Thus, inventory management of these sub-components becomes crucial in the manufacturing of products on schedule. This thesis looks at the problem of managing inventory so as to maximize a profit function associated with customer orders whose ordered parts are assembled on time. Because this problem is known to be NP-hard, we propose efficient heuristic methods for this problem. Two of these methods are implemented and tested against each other.
Description
Keywords
Citation
Source: Masters Abstracts International, Volume: 38-03, page: 0730.
