L’outil de licence Creative Commons du formulaire de soumission ne fonctionne pas actuellement. Pour ajouter une licence CC à votre thèse ou publication, contactez ruor@uottawa.ca après le dépôt. -- The Creative Commons licence tool in the submission form is currently unavailable. To apply a CC licence to your thesis or publication, contact ruor@uottawa.ca after the deposit.

Pump scheduling and reservoir releases for the optimization of water supply system operating costs.

En cours de chargement...
Vignette d'image

Date

Nom de la revue

ISSN de la revue

Titre du volume

Éditeur

University of Ottawa (Canada)

Résumé

The main goal of this project was to optimize pump scheduling and reservoir releases for the Regional Municipality of Ottawa-Carleton's (RMOC) water supply system. The first objective was to identify, through application of an optimization model (OM), the potential savings from improved pump scheduling for RMOC's water supply system. A computer model was designed to optimize electricity costs at RMOC's water purification plants (WPPs) using linear programming (LP) with a Borland's Quattro Pro spreadsheet and its built-in LP solver called Optimizer. The model has two levels of optimization: Level I, solving for pumping times and Level II, creating pump schedules. Model results were compiled for typical summer and winter days and monthly estimates were compared to the WPPs electricity bills. Although the model was not calibrated, energy costs were within 5% of the electricity bills. The second objective was to study the impact of different water management alternatives on energy costs. The alternatives considered were: (i) increasing operating volumes in the Billings Bridge and the Glen Cairn/Stittsville branches; (ii) increasing the treatment capacity at the Lemieux Island WPP; and (iii) considering a larger pipe size and additional smaller pumps in the Hurdman Bridge branch. (Abstract shortened by UMI.)

Description

Mots-clés

Citation

Source: Masters Abstracts International, Volume: 35-06, page: 1848.

Approbation

Évaluation

Complété par

Référencé par